CAP-04
Eight experienced welders. Stainless and carbon steel. Joints made to pass radiography.
Welding is the core of METALSALD. We work with TIG, MIG/MAG wire and stick (MMA) on industrial piping, tanks, structures and stainless fabrication, including projects where joints are radiographed up to 100%.

What we do
Industrial welding
The process is chosen by material, thickness and position: TIG for root passes and stainless steel, where penetration and a clean bead matter; MIG/MAG for productivity on structures and steelwork; stick where flexibility and positional or site work are needed. The extent of non-destructive examination follows the project specification.
- TIG (141) on stainless and carbon steel piping and components
- MIG/MAG (131/135) and wire welding for structures and steelwork
- Stick / MMA (111) for positional and site work
- Industrial piping and headers
- Tanks and pressure vessels
- Structures, frames and industrial components
- Stainless steel fabrication
Technical data
CAP-04
- Welders
- 8 experienced welders
- Processes (ISO 4063)
- 141 TIG · 131/135 MIG/MAG · 111 MMA
- Materials
- Stainless steel, carbon steel, Duplex 2205 and Super Duplex 2507 on tanks and vessels
- Non-destructive testing
- VT · PT · MT · UT · RT as specified
- Radiographic testing (RT)
- RT up to 100% where required by the project specifications
Reference projects
RFQ
Have a project to build?
Send us your P&ID, drawings or technical specifications. Our team will review the project.
Discuss your project
PDF · DWG · DXF · P&ID · STEP



