CAP-02
Industrial fabrication in carbon and stainless steel, built to drawing.
Skid frames, machine bases, support structures, casings and welded components: the steelwork that carries piping, equipment and plants.

What we do
Steel fabrication
We work from bar and plate to the welded, assembled component — ready for coating or to receive piping and equipment. Steelwork is often the first step of a skid, so we build it with anchor points, nozzles and pipe and cable routes already in mind.
- Skid frames and machine bases
- Support structures and plant steelwork
- Sheet-metal casings, enclosures and components
- Light stainless steel fabrication
- Pipe and equipment supports
- Welded components to customer drawings
- Preparation for surface treatment and coating
Production sequence
01Raw materialSteel sections and beams received in the workshop
02PreparationCut and drilled plates, ready for fabrication
03Fabrication / WeldingWelded components, marked for assembly
04AssemblyFrame assembled on the workbench
05Finished productComplete, drilled structure ready for delivery
Gallery


Technical data
CAP-02
- Materials
- Carbon steel, stainless steel
- Processes
- Preparation, TIG / MIG-MAG / MMA welding, assembly
- Workshop lifting capacity
- Up to 5 t
- Fabrication sizes and weights
- Assessed according to geometry, handling methods and project requirements
Reference projects
RFQ
Have a project to build?
Send us your P&ID, drawings or technical specifications. Our team will review the project.
Discuss your project
PDF · DWG · DXF · P&ID · STEP



